3. Following rig positioning, push the casing into the bottom. Generate steel casing into a minimum amount a depth of 1 m under the bottom degree to get lateral masses and movements at internet site. The steel casing also combat complications resulting from groundwater all through piling.Using a pile cropper could be allowed for the top part of the